Skip to content

●  Try us free: 8 hours of drafting on a real project, no commitment.

Cadra Solutions Cadra Solutions

Construction & foundation layout drafting

Construction-ready drafting for layout, forms, grids and foundation positions — prepared so your crew can stake with confidence.

  • Free 8-hour trial
  • Drafted in your template
  • AutoCAD & Civil 3D certified
  • 100% confidential

Free 8-hour trial · No commitment

Get a quote for Construction drafting

Free 8-hour trial on your first job.

Your request opens in WhatsApp and is emailed to our team, so we can reply on whichever you prefer. 100% confidential.

You send

What we need from you

  • Site and architectural plans
  • Foundation / structural drawings
  • Control and grid data
  • Your staking requirements
  • CAD template

You get

What we deliver

  • Layout drawings with grids
  • Foundation positions and offsets
  • Staking point lists
  • Labels and dimensions
  • DWG + PDF
CONSTRUCTION LAYOUT A B C D 1 2 3 3,600 4,200 3,600 3,000 3,600 COL NORTHING EASTING A-1 5214.380 2108.640 B-1 5214.380 2112.240 C-1 5214.380 2116.440 N

Illustration only · ask us for real sample drawings

Construction drafting FAQ

Can you produce staking point files?+

Yes, we can export point lists in the format your data collector uses.

Do you work from architectural PDFs?+

Yes, we can work from PDFs, DWGs or both.

Can you handle rush jobs?+

Choose 'Rush' in the form and tell us the deadline.

How does the free 8-hour trial work?+

Send us a real project. We draft up to 8 hours on it at no cost and with no commitment, so you can judge our quality, communication and speed before you pay anything.

How do you keep our files confidential?+

Your files are handled 100% confidentially, used only for your project, and we can sign an NDA before you send anything.

Built for US survey work

Drafted to US survey standards

2026 ALTA/NSPS standards

ALTA/NSPS surveys contracted from February 23, 2026 follow the new requirements. We draft to them, including the new Table A items and easement reporting.

Read the guide

State plane & datums

Coordinates in your state plane zone on NAD 83 / NAVD 88, matched to your control and labeled on the drawing.

US survey feet vs international feet

We confirm the unit of every dataset before drafting, so state plane coordinates don't shift.

Read the guide

State & county plat rules

Send your county checklist or recording requirements and every plat is drafted to them.

Mortgage & title work

Flood zone notes, setbacks and certifications in the format lenders and title companies expect.

Your seal, your standard

You make the boundary decisions and seal the drawing. We draft in your template and flag anything that doesn't add up.

Related guides

Other services

Start your free trial
WhatsApp Free trial